Skip to content
EV.ENGINEER™

EV.ENGINEER™ · Proof of Concept

Next-Generation Wireless EV Charging Digital Twin

Park. Drive. Charge. Automatically.

Explore, design and develop intelligent wireless electric vehicle charging systems through interactive 3D engineering, physics, mathematical modelling, IoT, artificial intelligence and experimental research.

8-Month Advanced Engineering Research & Practical WorkshopDesigned and developed by and for the EV.ENGINEER™ team.

Enter Research Laboratory

A cinematic view with a few meaningful controls.

3D view unavailable on this device

The simulation, panels and laboratories work fully. This is the field between the pads from the same model.

1 µT10 mT (log scale) · section through both pad centres · analytical filament model (F1), not FEM

01 · Digital Twin

Smart Wireless EV Charging Station

t = 0.0 s

Station and vehicle

INPUT
Alignment
40 mm
-30 mm
150 mm
Battery
80 %

Charging sequence

SIMULATED

1. Station availableIdle, self-tested, waiting for a vehicle. The pad is de-energised.

  1. 1. Station available
  2. 2. Vehicle approaching
  3. 3. Vehicle detected
  4. 4. Vehicle identification
  5. 5. Communication established
  6. 6. Charging authorisation
  7. 7. Alignment verification
  8. 8. Battery status verification
  9. 9. Safety checks
  10. 10. Low-power initialisation
  11. 11. Resonance verification
  12. 12. Controlled power ramp-up
  13. 13. Active charging
  14. 14. Charging power optimisation
  15. 15. Target SOC reached
  16. 16. Controlled power ramp-down
  17. 17. Charging completed
  18. 18. Vehicle departure
  19. 19. Station available

    Power and efficiency

    CALCULATED
    Grid input
    0.00 kW
    Received (rectifier in)
    0.00 kW
    Battery charging
    0.00 kW
    Grid-to-battery efficiency
    —
    Coil-to-coil efficiency
    —
    Total losses
    0 W
    Limited by
    off

    Magnetic coupling and resonance

    CALCULATED
    Coupling coefficient k
    0.365air core 0.241
    Mutual inductance M
    28.19 µH

    Battery and session

    CALCULATED
    SOC 30.0 %
    Pack voltage / current
    348 V / 0.0 A
    Energy delivered (this run)
    0.000 kWh
    Grid energy (this run)
    0.000 kWh
    Charging cost
    0.00 ₹ at 8.5/kWh

    The research question

    How can electric vehicles receive electrical energy wirelessly, safely, efficiently and intelligently, whether parked or moving?

    Every behaviour shown in the twin traces to a stated physical principle, equation, declared approximation or numerical model. One engine — magnetic coupling, resonant circuits, power converters, battery, thermal, vehicle motion, communication and energy dispatch — drives all four environments, every graph and every number.

    Four connected digital twins

    • 01

      Smart Wireless EV Charging Station

      Stationary wireless charging while the vehicle is parked: home, apartment, office, commercial and public parking, bus terminals, fleet depots and opportunity charging.

    • 02

      Dynamic Wireless EV Charging

      Charging while driving over an electrified road: segmented transmitter pads, moving receivers, position-dependent coupling, intelligent coil activation and the vehicle's energy balance.

    • 03

      Autonomous Wireless EV Charging

      Self-operating vehicles that find a compatible station, reserve it, park precisely over the pad, authenticate, charge and return to their mission — in simulation.

    • 04

      Smart Charging Infrastructure & Energy Intelligence

      A connected district: grid limits, solar PV, battery storage, parking bays, a fleet depot and an electrified road, under competing allocation policies and tariffs.

    The electrical energy chain

    From the grid to the battery, through every stage the simulation accounts for. Grid power always equals battery power plus the sum of every stage’s loss.

    1. Grid connectionSupplies the station from the low-voltage distribution network.
    2. Circuit protection and isolationDisconnects the station on overcurrent, earth fault or emergency stop, and isolates it for maintenance.
    3. TransformerAdapts and isolates the supply voltage.
    4. AC–DC converter with power-factor correctionRectifies the supply to a regulated DC link while drawing near-sinusoidal current.
    5. DC-link capacitorBuffers energy between the PFC and the high-frequency inverter.
    6. High-frequency inverterTurns the DC link into an 85 kHz quasi-square wave that drives the resonant transmitter.
    7. Primary resonant compensationCancels the transmitter's reactance so the inverter sees a near-resistive load.
    8. Transmitter coil (Litz winding)Creates the alternating magnetic field that couples to the vehicle.
    9. Receiver coilPicks up the alternating flux and turns it into an induced EMF.
    10. Secondary compensation networkResonates the receiver so the induced EMF drives current into the load efficiently.
    11. RectifierTurns the 85 kHz current into DC for the vehicle bus.
    12. Vehicle DC–DC converterRegulates battery charging and sets the rectifier voltage for best link efficiency.
    13. Battery Management SystemMeasures cells, estimates SOC, sets charging limits and reports them to the station.
    14. Battery packStores the delivered energy.

    Models, fidelity and validation

    20 registered models. Fidelity runs from F0 (conceptual visualisation) to F5 (connected prototype twin). Analytical verification compares a model with an independent result; experimental validation needs measurements, and none is claimed.

    ModelFidelityStatusMain limitation
    WPT-EM-001 · Circular-filament magnetic couplerF1Analytically verifiedFinite ferrite extent is only approximated by the coverage factor (calibrate with FEM or measurement).
    WPT-EM-002 · Coupler field sectionF1Analytically verifiedNot a finite-element solution: no ferrite edges, shields or vehicle body.
    WPT-CIR-001 · Series–series compensated link (closed form)F1Analytically verifiedNo harmonics, dead time or switching transients.
    WPT-CIR-002 · AC nodal analysis of compensation topologiesF1Analytically verifiedFrequency domain only: no switching waveforms; a time-domain SPICE run is an open extension.
    WPT-LOSS-001 · Winding and capacitor resistanceF1TestedF_R should come from a Litz model (e.g. Sullivan) or measurement.
    WPT-LOSS-002 · Inverter semiconductor lossesF1ImplementedNo dead-time, reverse recovery or gate-charge detail; datasheet curves should replace the defaults.
    WPT-LOSS-003 · Converter loss modelF1TestedFit p0, a, b to measured efficiency curves before quantitative use.
    WPT-TH-001 · Lumped thermal networkF2Analytically verifiedNo spatial gradients or hot spots; foreign-object heating coefficient is illustrative and uncalibrated.
    WPT-BAT-001 · Battery pack equivalent circuitF2TestedNo ageing, hysteresis or cell imbalance. The degradation indicator is a relative stress heuristic, not a lifetime prediction.
    WPT-VEH-001 · Longitudinal road loadF1TestedNo efficiency maps, wind or tyre slip.
    WPT-SYS-001 · End-to-end stationary power chainF1Analytically verifiedStored-energy changes in the DC links and resonant tanks are neglected.
    WPT-CTRL-001 · Charging state machine with safety precedenceF1TestedResponse times are step-quantised (50 ms interactive).
    WPT-SIM-001 · Smart wireless charging station simulationF2TestedSingle bay; one vehicle per session.
    WPT-SIM-002 · Dynamic road charging simulationF2TestedOne vehicle; no traffic interaction; rectangular/DD road coils not modelled yet.
    WPT-AV-001 · Kinematic bicycle and pure-pursuit parkingF2TestedForward parking only; no obstacles or other vehicles.
    WPT-AV-002 · Extended Kalman filter localisationF2TestedLatency compensation by odometry displacement, not a full delayed-state filter.
    WPT-AV-003 · Charging-station selectionF1TestedNo live availability feed; no stochastic travel times.
    WPT-GRID-001 · District energy dispatchF1TestedNo network power flow or voltage limits; no forecasting error model.
    WPT-IOT-001 · Communication networkF1TestedThe message dictionary and tag are this simulator's own: not a standard protocol, not an OEM database, not cryptography.
    WPT-DATA-001 · Sensor and telemetry modelF1TestedNo drift or temperature coefficients; no hardware connected (never LIVE).

    8-Month Advanced Engineering Research & Practical Workshop

    32 weeks, 64 learning and experimental units, about 352 hours. Completing the workshop does not guarantee a research publication or confer formal academic accreditation.

    1. Month 1 — Physics and mathematical foundationsDeliverable: Validated fundamental electromagnetic coupling model.
    2. Month 2 — Wireless power transfer and magnetic engineeringDeliverable: Coil design and experimentally measurable coupling map.
    3. Month 3 — Power electronics and stationary chargingDeliverable: Stationary wireless charging simulation and supervised low-voltage proof of concept.
    4. Month 4 — IoT-enabled Smart Wireless EV Charging StationDeliverable: Connected wireless parking charging prototype with telemetry.
    5. Month 5 — Dynamic Wireless EV ChargingDeliverable: Moving-receiver wireless charging test-track prototype.
    6. Month 6 — Autonomous Wireless EV ChargingDeliverable: Simulated autonomous vehicle with automatic charging station discovery and precision alignment.
    7. Month 7 — Smart infrastructure, AI and energy intelligenceDeliverable: Intelligent charging infrastructure simulation and optimisation study.
    8. Month 8 — Integration, validation and researchDeliverable: Complete integrated Wireless EV Charging Digital Twin, experimental evidence, engineering report and research presentation.

    Physical proof of concept

    1. POC 01 — Fundamental wireless energy transferA stationary transmitter and receiver; measure induced voltage against frequency, gap and offset.
    2. POC 02 — Resonant wireless power transferResonance, coupling and efficiency of an SS link at low voltage.
    3. POC 03 — Smart Wireless EV Charging Station (miniature)Automatic vehicle detection, alignment check, telemetry and the charging state machine.
    4. POC 04 — Dynamic Wireless EV Charging trackA moving receiver over a line of segmented transmitters.
    5. POC 05 — Autonomous charging vehicle (miniature)Simulated or supervised automatic parking and wireless charging.
    6. POC 06 — Integrated intelligent mobility ecosystemParking station, dynamic track, miniature vehicle, controllers, battery monitoring, gateway, twin and experiment management together.

    All initial hardware uses isolated, current-limited, low-voltage laboratory equipment under qualified supervision. High-power EV charging hardware is a separate advanced engineering undertaking that needs suitable laboratory infrastructure, electrical protection and safety assessment. The web application never operates hardware.

    Engineering assurance

    Seven review gates, from Mission Concept Review to Final Research Review, each with criteria, evidence and outstanding issues. None is shown as approved.

    • MCR · Mission Concept Review — Ready for review
    • SRR · System Requirements Review — Evidence in preparation
    • PDR · Preliminary Design Review — Evidence in preparation
    • CDR · Critical Design Review — Not started
    • TRR · Test Readiness Review — Not started
    • VRR · Validation Readiness Review — Not started
    • FRR · Final Research Review — Not started

    Standards awareness covers SAE J2954, IEC 61980 series, ISO 19363, ISO 15118-20, OCPP 2.0.1, IEC 61851 series, ISO 26262, IEC 61508, ISO/SAE 21434, IEC 62443 series, IEC 61000 series, ICNIRP 2010, IEEE C95.1. Their applicability and current editions are to be verified; no compliance or certification is claimed.

    Research & Attribution

    Research & Project Leadership

    Researchers guiding the Next-Generation Wireless EV Charging Digital Twin engineering and research initiative through EV.ENGINEER™

    • Lead Researcher · EV.ENGINEER™

      Ms. Tanuja Jadhav

      EV.ENGINEER™

      Leads research direction for the Next-Generation Wireless EV Charging Digital Twin, coordinating student research across stationary, dynamic and autonomous wireless charging and guiding the 8-Month Advanced Engineering Research & Practical Workshop. Also leads the AegisCAN initiative.

    • Co-Researcher · EV.ENGINEER™

      Mr. Sudarshana Karkala

      EV.ENGINEER™

      Contributes to the digital twin’s engineering architecture, simulation and model verification, and the physical proof-of-concept roadmap, within the broader EV.ENGINEER™ engineering research framework.

    Frequently asked questions

    Is this a simulation or connected to real hardware?

    A simulation. Every value is computed by the models in this application and labelled SIMULATED or ESTIMATED. No physical prototype is connected, so nothing is shown as LIVE.

    How accurate is the magnetic model?

    It is an analytical filament model with ferrite represented by images (fidelity F1). It agrees with independent numerical integration to better than one part in a million, but real pads with finite ferrite, shields and vehicle floors need FEM or measurement to calibrate it.

    Does wireless charging while driving always increase the battery's charge?

    No. The battery gains energy only when received power exceeds traction demand. At highway speeds with partial coverage the battery can still discharge; the Dynamic twin shows all three regimes.

    Why does the station stop when the vehicle moves sideways?

    In a series–series link, a sudden fall in coupling at the same inverter voltage drives the primary current up. The protection trips before the controller can respond, exactly as the twin shows.

    Can the field view tell me whether exposure is safe?

    No. It shows the analytical field between the pads. Exposure assessment needs measured or finite-element fields compared with the applicable guideline.

    Does it comply with wireless charging standards?

    No compliance is claimed. The standards registry lists relevant publications whose applicability and current editions still need to be verified.

    What hardware does the programme build?

    Low-voltage, current-limited laboratory prototypes under qualified supervision, from a two-coil experiment to an integrated miniature ecosystem. High-power EV hardware is outside its scope.